Heavy Oil
Forums  Workshops  TIS  RFPs  Projects   2002 11 13 LF 

Project


1999 00 00
Vapex Refinery Upgrading Project

With the financial assistance of AOSTRA and work-in-kind by NCUT, Gibson Petroleum and Chevron (California), this $68,000 PRI operated project has been launched following a PTAC Technology Information Session sponsored by Renaissance Energy. The 23 participants in the VAPEX Engineering and Economics Phase 2 project have access to the results. PRI is producing a large volume of VAPEX sample production in laboratory physical models for the required refinery related experiments.

The VAPEX process produces oil of reduced viscosity due to the precipitation of asphalt in the reservoir. The lower asphalt content increases the value of the production, reduces refinery emissions due to lower requirement for hy-drogen (CO2 is a by-product of H2 production) and debottle-necks refinery operations.


For further information
please contact:

Richard Luhning, ARC-PRI
phone: (403) 268-7553
fax: (403) 920-0054

luhningr@cadvision.com

BACK TO TOP
© 2000 PTAC