|
2007 11 30
Downhole Oil/Water Separation
Registration
2007 06 26
Increasing Production Output and Reliability With Improved Operational Scheduling
Presentation
2007 02 01
Low GHG Recovery Technology Scenarios for Two Challenging Deposits:
The Grosmont Carbonate Formation and Lloydminster Post Cold Production
Presentation
2006 09 20
Polymer Flooding Heavy Oils from 100 to 10,000 cp:
A New Technical and Economic Reality
2004 02 24
ROCKSBank™ -
A Rock Mechanical and Petrophysical Database for the Energy Industry: A New Joint Industry Project
2003 01 23
In Situ Development - Reduce Your Risk An
Integrated Multi-discipline Approach to Development of Oil Sands &
Heavy Oil Leases
Presentation -
PDF (3,252 KB)
2002 10 29
Below-the-reservoir Production of Crude Oil and Gas Joint Industry
Project (JIP)
2002 09 24
2002/03 Proposed Petroleum Research Program
at PTRC Presentation - PDF (942 KB)
2002 06 10
ARC THAI/CAPRI Engineering Industry Participation Meeting
2002 02 13
VAPEX Engineering and Economics for Heavy Oil Pilots in
Saskatchewan and Alberta
Presentation by Doug Lillico (PDF 86KB)
Presentation by Richard Luhning (PDF 30KB)
Presentation by Colin Laberge (PDF 13KB)
2001 11 01
Crude Oil Document Exchange (CDOX)
Presentation PDF (32 KB)
2001 09 21
Advanced Simulator
Development for Cold Heavy Oil Production Enhancement, Sand Production Rate, and Cavity
Completion
2001 04 03
Post-Cold Flow Production Project Workshop and Startup
2000 06 28
Toe To Heel Water Flooding: An
Effective Short Distance Oil Displacement Process for Light Heavy Oil Reservoirs
2000 05 30
Vapex Engineering and Economics for Heavy Oil Recovery in Saskatchewan and Alberta
Resulting Project
2000 05 10
Options for Utilization of Heavy Oil Vent Gases
Project Information
2000 04 19
Bioremediation of Produced Sand
from Heavy Oil Operations – Research Project
1999 10 21
Heavy Oil Fluid Gathering System
Alternatives – Phase II
Resulting Project
1999 05 04
Cold Foamy Flow Heavy Oil Wells
– Methods to Restart Shut-in Wells
1999 04 29
Direct Production of Light Oil from
A Heavy Oil Reservoir "CAPRI" in-situ Catalytic Heavy Oil Upgrading Engineering
and Economics
1999 04 22
In Situ and Refinery Upgrading of
Vapex Heavy Oil Production for Increased Value and Reduced Emissions
Resulting Project
1999 03 29
Hydraulic Submersible Pump A New
and Innovative Approach to Heavy Oil Production
1999 03 10
Electric Submersible Progressing
Cavity Pump (ESPCP)
The System and Deployment Methods
1999 03 10
Alternate Progressive Cavity Pump
Drive
1998 12 15
Understanding the Mechanisms of
Well Casing Deformation
1998 12 10
Vapex Operations Design –
How to Operate Vapex Process in the Field
Resulting Project
1998 12 03
Thermal Solvent Process –
Field Scale Engineering & Economics
Resulting Project
1997 10 19
Development of Full Project
Engineering and Economics for the Vapex Process
Resulting Project
1997 09 23
Artificial Lifting Systems
Strategies for Oil Recovery from Thermal Horizontal Wells
1997 09 16
Heavy Oil Gathering Systems
Workshop - Proceedings
Resulting Project
1997 06 24
Methane Pressure Cycling With
Horizontal Wells for Heavy Oil Reservoirs
1997 05 27
Hydraulic Submersible Rotary Pump
Drives
1997 05 26
Heavy Oil Upgrading With Water Via
Supercritical Partial Oxidation
Resulting Project
|