CO2 Enhanced Hydrocarbon RecoveryForums Workshops TIS RFPs Projects Technical Links Technical Steering Committee |
||||
Request for Proposals |
2006 07 26 Design and Cost Estimate for Central Terminal System for Collection of
High Purity CO2 Emissions in Fort
Saskatchewan and Sturgeon, Alberta Area with CO2
Pipeline to Pembina and Swan Hills for Use in Enhanced Oil Recovery |
|||
|
|
|
|||
|
PTAC is only a facilitator for these presentations. PTAC makes no representation regarding ownership or quality of any technology described by a presenter, or generally as to the contents of a presentation. PTAC does not endorse any presenter nor the technology presented. Please use your own judgment. PTAC trusts that each presenter will engage in fair trade practices, but does not police or otherwise enforce this policy in any manner. |
||||
|
2007 02 23 LF |
|
|||