Well Completion

Forums   Workshops  TIS   RFPs  Projects  Technical Links  

   

Technology Information Sessions

 

2004 06 16

Enhanced Well Performance and Increased Oil Production using a Chemical Inflow Stimulation Process
Presentation PDF (381 KB)

2004 02 24

ROCKSBank™ - A Rock Mechanical and Petrophysical Database for the Energy Industry: A New Joint Industry Project

2002 02 21

Pinnacle Technologies Fracture Diagnostics for Mapping Hydraulic Fractures

2001 05 10

Modular Reservoir Casing Driller (MRCD) for Reservoir Evaluation

2001 04 24

Using the Polybore System to Extend Production Life

2000 02 03

Rod Based Wire Wrapped Screens

1999 05 20

PRIstine Process to Remove Pyrobitumen Blockage in Reservoirs

1999 01 12

Formation Heat Treatment (FHT) – A New Innovative Approach to Damage Removal

1998 03 25

Field Pilot to Remove Pyrobitumen Blockage from Oil and Gas Reservoirs with the PRIstine Process

1998 03 17

Field Pilot to Remove Pyrobitumen Blockage from Oil and Gas Carbonate Reservoirs using the PRIstine Process
Resulting Project

1998 01 28

Near Wellbore Treatment to Reduce Gas Coning/Channeling
Resulting Project

   
 

to top

     


For further information,
please contact:


Arlene Merling,
PTAC
Manager, Operations
phone 403 218-7702
fax 403 920-0054
amerling@ptac.org

     
 


DISCLAIMER

PTAC is only a facilitator for these presentations. PTAC makes no representation regarding ownership or quality of any technology described by a presenter, or generally as to the contents of a presentation. PTAC does not endorse any presenter nor the technology presented. Please use your own judgment. PTAC trusts that each presenter will engage in fair trade practices, but does not police or otherwise enforce this policy in any manner.

   

2007 07 20 LF