Well Completion |
||||
Technology Information Sessions |
2004 06 16 Enhanced Well Performance and Increased Oil
Production using a Chemical Inflow Stimulation Process 2004 02 24 2002 02 21 Pinnacle Technologies Fracture Diagnostics for Mapping Hydraulic Fractures 2001 05 10 Modular Reservoir Casing Driller (MRCD) for Reservoir Evaluation 2001 04 24 Using the Polybore System to Extend Production Life 2000 02 03 Rod Based Wire Wrapped Screens 1999 05 20 PRIstine Process to Remove Pyrobitumen Blockage in Reservoirs 1999 01 12 Formation Heat Treatment (FHT) – A New Innovative Approach to Damage Removal 1998 03 25 Field Pilot to Remove Pyrobitumen Blockage from Oil and Gas Reservoirs with the PRIstine Process 1998 03 17 Field Pilot to Remove Pyrobitumen Blockage from Oil and Gas Carbonate Reservoirs using the PRIstine
Process 1998 01 28 Near Wellbore Treatment to Reduce Gas Coning/Channeling |
|||
|
|
|
|||
|
PTAC is only a facilitator for these presentations. PTAC makes no representation regarding ownership or quality of any technology described by a presenter, or generally as to the contents of a presentation. PTAC does not endorse any presenter nor the technology presented. Please use your own judgment. PTAC trusts that each presenter will engage in fair trade practices, but does not police or otherwise enforce this policy in any manner. |
||||
|
2007 07 20 LF |
|
|||